Here is the setup:
Requirement 1 - Cycle 1
Test 1.1---------------------No Run
Test 1.2---------------------No Run
After Execution:
Requirement 1 - Cycle 1
Test 1.1---------------------Passed
Test 1.2---------------------Failed
Need help with:
I am expecting the fix for Test 1.2 in Cycle 2.
(1) Is there a way to "Retest" Test 1.2 in Cycle 2?
(2) Can I change the Target Cycle in "Continue Manual Run" mode?
(3) Will Requirement 1's Direct Cover Status display Pass if I leave Test 1.2 in Failed status in Cycle 1?
(4) Since the latest iteration result of this test is Pass, does ALM recognize that as the final status ?
Thanks !