Quantcast
Channel: All Quality Center / ALM Practitioners Forum posts
Viewing all articles
Browse latest Browse all 14708

Re: Creating a project from an existing project Issue

$
0
0

Thanks for the reply.

 

The oracle db is around 390 MEG, and the Repository on the Linux filesystem is 174 MEG.    So, very small.  And I have never tried to do the export/import option of Quality Center.

 

I was wondering if there was something wrong with the Oracle database, but the Oracle DBA has been looking at it and doesn't see anything.

 

Thanks!


Viewing all articles
Browse latest Browse all 14708

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>