We are trying to take report for the particular date in "defect" module . The issue here is, if the dates or months are single digit(eg: 1/1/2013), then we are not getting that particular date in the output result. Kindly help us to resilve the same.
Addtional detail: When we verify the system field "detected on date" in project entities, the field length is "1" ---is this correct?.
Also there is one more user field closed date, which data type is string -- Designed to populate the date when the defect is closed.
We have tried to filter through both the field stated above, but still we couldn't get the single digit date/month in the result.
Thanks in advance.