Hi,
I would think this is a pretty logical thing to do if you are using QC and QTP but in all my searching I cannot find an example of someone doing it.
We have an Integration Test Instance and run, that has test values in the run_steps that we want to use in QTP to run scripts with. My team and I unfortunately are not sure the linking reference between the Test Instance and where it appears either the Test Plan Module or the Manual Runner are getting the Steps from. How do we make this link?
We can find the path to the test instance, but need to connect the Test ID and the linked run steps that have the value. I don't need all the code, just help with connecting the final steps.
I can make the connection to the TC_TEST_INSTANCE but how do I add the correlation to the TS_NAME and then the connected steps in that run?
I need certain values from here: